Commit Graph
40 Commits
Author SHA1 Message Date
hy 7cd3782f1e Refactor macOS release handling: remove x64 support and streamline metadata processing
- Removed support for macos-x64 in fragment definitions and related scripts.
- Updated finalize-macos script to only handle macos-arm64, simplifying signature checks and metadata writing.
- Deleted merge-mac-metadata script as it is no longer needed.
- Adjusted storage layout and release status checks to reflect the removal of x64.
- Updated tests to ensure they only validate macos-arm64 functionality.
2026-09-01 16:36:09 +08:00
hy b5bb0e221b refactor: reorganize test fixtures and update references
- Moved test fixtures from `tests/fixtures/workspace` to `tests/fixtures/backend` for better structure and clarity.
- Updated all references in test cases to point to the new fixture paths.
- Removed obsolete fixture generation scripts for Excel and DOCX files.
- Enforced read-only constraints on fixture files, ensuring tests do not modify them directly.
- Added new binary files for backend fixtures to support ongoing tests.
2026-08-31 15:51:52 +08:00
hy e9bef184bb feat: implement update required page and app startup status handling
- Added a new UpdateRequiredPage component to handle scenarios where an application update is required before accessing the main interface.
- Integrated app startup status retrieval in the App component to determine if the application is in a normal state or requires an update.
- Updated routing logic to conditionally render the UpdateRequiredPage or the main application layout based on the startup status.
- Enhanced the AppUpdateContext to manage update actions and states effectively.
- Introduced new selectors for testing the update required page and its components.
- Added constants for app startup channels to facilitate communication between the main and renderer processes.
- Updated shared types to include AppStartupStatus for better type safety.
- Created unit tests for SQLite migration to ensure database integrity during updates.
- Implemented end-to-end tests to verify the update flow and recovery page functionality.
2026-08-31 12:39:39 +08:00
Yoan Huang 27ac7db168 feat: update AI test plans and fixtures for Excel and PPT tools
- Refactored test plans for Excel-related tasks, including updates to task descriptions and expected outcomes.
- Introduced a new fixture generator for creating a detailed Excel file for weekly reviews.
- Updated existing tests to reference new Chinese-named Excel and PPT files, ensuring consistency in naming conventions.
- Enhanced test assertions to validate specific changes made during Excel editing tasks.
- Removed outdated fixture files and replaced them with new ones in Chinese.
- Improved descriptions in test cases to reflect the changes in language and context.
2026-08-30 12:44:25 +08:00
hy 04e405b467 feat: enhance image handling in AI executor and tests
- Added support for forwarding image blocks to the main model in llm-executor-text.test.ts, including error handling for unsupported image formats.
- Improved image normalization and caching logic in read-image-multimodal.test.ts, ensuring consistent handling of local and remote images.
- Updated terminal-session-manager.test.ts to improve command execution validation.
- Refined llm-config-guard.test.ts and llm-presets-contract.test.ts to enhance config validation and preset handling.
- Enhanced web crawler service tests for better coverage and reliability.
- Improved workspace index worker tests to ensure accurate file handling and content hashing.
- Updated composer attachment tests to validate attachment handling and ensure proper UI interactions.
- Refined model selector tests to improve user experience and error handling in the workbench.
- Added agent control tool harness for better testing capabilities in AI tool interactions.
2026-08-28 18:51:52 +08:00
hy de33cf92c5 feat: add help option to runner and handle unknown arguments 2026-08-27 11:11:14 +08:00
hy af027a4df9 refactor: remove retries from workflow and update related tests 2026-08-26 19:41:34 +08:00
hy 17c9ca1056 fix: remove LIVE_BACKEND_RETRIES and set retries to 0 in workflow 2026-08-26 19:30:45 +08:00
hy 4f22999edc feat: add Excel and DOCX fixtures for enhanced testing and metadata indexing 2026-08-26 14:54:03 +08:00
Yoan Huang e111dfe7ab feat: enhance E2E test workflow and improve tool call handling in tests 2026-08-23 19:33:04 +08:00
Yoan Huang 09f37e7d29 feat: enhance environment configuration for Vitest with LANGSMITH_TRACING support 2026-08-23 14:57:36 +08:00
Yoan Huang 3f62417530 feat: Enhance AI testing and update process
- Updated AI test plan with new results for visual reading tests, marking them as completed after fixing configuration issues.
- Added a new script for real upgrade testing on Windows, allowing verification of silent upgrades and proper handling of old installations.
- Introduced concurrency handling in visual recognition service to improve performance during image processing.
- Refactored legacy document editing tests to ensure proper rejection of .doc file edits and adherence to decision hints.
- Adjusted PowerPoint management review tests to include both Chinese and English date formats for better validation.
2026-08-21 23:15:23 +08:00
hy 35adfe50c7 feat: improve process termination handling for sidecar services 2026-08-21 18:19:14 +08:00
hy 9dad1c9ec0 fix(test): always run vector warmup for package E2E when running multiple cases
The only warmup case lives under the settings domain, so filtering with
--domain/--suite/--case excluded it and left every selected case to index
the workspace fixture from scratch. Package E2E now appends the warmup
case whenever more than one case is selected, and the warmup task bypasses
--testNamePattern so targeted --case runs still seed the shared cache.
2026-08-19 15:15:32 +08:00
hy b0cf4fc052 feat: support multiple --case targets for release package E2E and drop dead resume-passed flow 2026-08-05 14:31:26 +08:00
hy 2b853c70e2 test: clean stale E2E temp dirs before runs and remove stray media capture test 2026-08-04 13:23:19 +08:00
Yoan Huang 45c6d96663 feat: add human terminal data reconciliation live test and remove deprecated preview service test
- Introduced a new test for human terminal data reconciliation that verifies the reconciliation of invoices and payments, ensuring the correct generation of exception CSV files.
- Removed the outdated human terminal preview service live test, which was no longer relevant.
- Updated human text file read/write tests to focus on checkout configuration readiness and cutover processes.
- Enhanced web crawl tests to ensure accurate multi-hop crawling and URL inference for public service information.
- Refactored llmConfig and run-backend-case to streamline live model configuration handling, including vision model support.
- Improved error handling in electron app launch process to capture diagnostics on failure.
2026-08-01 19:02:11 +08:00
hy 2ba4711039 feat: enhance DOCX visual handling with new fixtures and tests for live reading 2026-07-30 11:44:28 +08:00
hy c3b51d82e5 feat(workbench): add e2e tests for interrupted task resume flow and adjust backend live retries 2026-07-28 18:10:20 +08:00
hy f582ba2e8e feat: enhance AI runtime context and human task management
- Added humanRuntimeOverrides to the AI run context to allow for runtime configuration adjustments.
- Updated HumanResumeSnapshot to include taskContext for better tracking of task interruptions and recoveries.
- Introduced functions to create and render human task contexts, capturing interruption reasons and user inputs.
- Enhanced error classification to include runtime limits and unexpected errors.
- Implemented database migration to reset resume snapshots for versioning.
- Updated tests to cover new runtime limit features and ensure proper handling of task contexts during interruptions.
- Improved workspace knowledge cache to support shared content caching and statistics tracking.
2026-07-28 17:04:59 +08:00
hy f21086b36a refactor: remove outdated Excel and PPT visual smoke tests; add new Excel diff and revert tests
- Deleted the unit tests for Excel tools and PPT visual smoke tests as they are no longer relevant.
- Introduced new end-to-end tests for Excel file creation, update, and revert functionality, ensuring proper diff handling and file state validation.
- Updated workbench conversation tests to enhance attachment handling and AI interaction.
- Improved file preview actions to support Excel file types and validate their previews.
2026-07-28 11:46:28 +08:00
hy 180986beb6 test: allow three concurrent live E2E cases 2026-07-28 09:42:07 +08:00
hy 8ff10ae0b2 test: refine macOS release E2E scheduling 2026-07-27 19:24:41 +08:00
hy cb740580ed test: add cross-architecture warm-up checks to app update publish config 2026-07-27 17:07:21 +08:00
hy 35a6e67864 fix(test): serialize browser-backed ppt cases 2026-07-27 15:45:22 +08:00
hy ed3f555efb fix(test): stabilize parallel release coverage 2026-07-27 15:28:13 +08:00
Yoan Huang fd09e47210 fix(tests): prepare Node SQLite binding for package e2e 2026-07-26 13:50:44 +08:00
Yoan Huang 95118ea6a0 feat(tests): warm vector cache before parallel e2e 2026-07-26 12:24:26 +08:00
Yoan Huang 81b130bb67 feat(tests): update execution modes and improve workspace binding
- Set execution mode to 'exclusive' for specific e2e tests to ensure isolated execution.
- Set execution mode to 'live' for various e2e tests to enable real-time interactions.
- Refactor workspace binding in tests to use direct binding method for improved reliability.
- Enable file parallelism in Vitest configurations to enhance test execution efficiency.
2026-07-26 10:54:29 +08:00
Yoan Huang d4974286ef refactor: update test cases to improve structure and clarity
- Remove obsolete end-to-end test for system notification session navigation.
- Enhance workspace scan progress tests to verify UI state restoration.
- Update web prepare progress tests to ensure correct UI behavior after navigation.
- Refactor unit tests for AI persistence and model configuration to improve naming consistency.
- Modify release tests to use localized product names and ensure correct artifact naming.
- Adjust vector and workspace backend tests to reflect unit test categorization.
- Improve error handling in web crawler test utilities.
- Update Electron app launch environment to support additional environment variables.
- Refactor end-to-end test cases for workbench to improve readability and maintainability.
2026-07-25 11:22:23 +08:00
Yoan Huang 61f7301eb7 feat: add Tidy process documentation and enhance test workflows
- Introduced a new documentation file for the Tidy process, outlining steps for aligning documentation with implementation, organizing PRD and test cases, and verifying settings.
- Updated package.json to include a new test command for non-live AI tests and adjusted existing test commands for settings and updates.
- Implemented a cleanup function for local test logs in the release scripts to ensure a clean environment.
- Enhanced the release preparation script to include unit and non-live AI tests in the workflow.
- Added a new script to validate test architecture, ensuring that test cases align with defined plans and rules.
- Refactored existing test cases to improve organization and clarity, including renaming and restructuring tests for better maintainability.
- Adjusted timeout settings for specific tests to improve reliability.
- Corrected domain assignments in several unit tests to ensure proper categorization.
2026-07-25 08:36:13 +08:00
Yoan Huang ada4c149e0 refactor(release): require packaged regression before publish 2026-07-24 22:19:25 +08:00
hy b48859389d feat: implement structured output strategy and retry mechanism with exponential backoff 2026-07-23 13:46:58 +08:00
Yoan Huang 5ec6bf1824 feat(release): split candidate preparation and publishing 2026-07-22 11:46:50 +08:00
Yoan Huang 4ddc364528 feat(release): implement artifact bundle creation and verification
- Added `artifact-bundle.mjs` for creating and verifying release bundles.
- Updated macOS and Windows release scripts to create and upload release bundles.
- Introduced `--package-e2e` flag to run end-to-end tests on packaged releases.
- Modified `package.json` scripts to remove deprecated commands and streamline release process.
- Enhanced E2E testing to utilize release bundles instead of building from source.
- Added unit tests for artifact bundle creation and verification.
- Removed obsolete `route-windows.mjs` script in favor of a unified `windows.mjs` script.
2026-07-22 11:31:12 +08:00
Yoan Huang bc7794813f Refactor E2E tests to improve resource management and cleanup
- Introduced E2EResourceScope for managing resources during E2E tests.
- Updated test cases to register resources and handle disposal in a structured manner.
- Enhanced error handling during resource disposal to capture and report errors.
- Modified workspace setup functions to ensure proper cleanup after tests.
- Adjusted imports and added necessary utility functions for resource management.
2026-07-21 22:56:50 +08:00
hy 8b1b619e04 feat: implement workspace knowledge cache with hit/miss tracking and update related tests 2026-07-20 19:26:56 +08:00
hy fb0c157809 refactor: remove real update test scripts and related commands
- Deleted the `update-real.mjs` and `update-real-windows.mjs` scripts as they are no longer needed.
- Updated `package.json` to remove references to the real update test commands.
- Adjusted documentation in `test.md`, `settings-test.md`, and `release.md` to reflect changes in the update testing process, focusing on simulated updates instead of real updates.
2026-07-20 18:43:46 +08:00
hy 6e5332670a refactor: change launchMode to serviceMode in e2e tests
- Updated multiple e2e test files to replace 'launchMode: real' with 'serviceMode: real' for consistency in service mode configuration.
- Refactored the electronApp.ts to introduce E2EServiceMode and related types for better clarity and maintainability.
- Enhanced run-e2e-case.ts to accommodate the new service mode structure, ensuring proper handling of test cases.
- Created workspaceFixture.ts to manage temporary workspaces more efficiently during tests.
2026-07-20 18:10:50 +08:00
hy 7b057c05f8 refactor: reorganize scripts and update paths for build and release processes
- Removed obsolete test script `test_crawl4ai_fit_markdown.py`.
- Deleted `verify-package-main-obfuscation.mjs` as it is no longer needed.
- Updated paths in `app-update-publish-config.test.ts` to reflect new script locations.
- Refactored `package-content-policy.test.ts` to use new paths for content policy scripts.
- Adjusted `package-main-obfuscation.test.ts` to point to the new obfuscation script locations.
- Modified `package-size-budget.test.ts` to use updated paths for size budget scripts.
- Changed `r2-update-metadata-contract.test.ts` to reference the new metadata script.
- Updated `release-fragment-contract.test.ts` to use the new fragment contract script.
- Refactored `release-storage-layout.test.ts` to point to the new storage layout script.
- Added `runtime-trace.test.ts` to test runtime tracing functionality.
- Updated `node-pty-native-release.test.ts` to reflect new paths for native release scripts.
2026-07-20 17:03:38 +08:00